Project Overview

TOP A INDIA Contractors carried out specialised injection and grouting works at Sholayar Dam as part of the treatment of the dam structure. The works focused on addressing internal voids and water paths within the masonry and improving the overall integrity and water-tightness of the treated sections.

Project Challenge

  • Water seepage through cracks, joints and internal voids within the ageing dam structure.
  • Porous and deteriorated masonry creating potential pathways for water movement.
  • Internal cavities requiring treatment beyond conventional surface-level repairs.
  • Maintaining the integrity and long-term performance of the dam structure.

 

Client

Sholayar Dam

Category

Injection & Grouting

Location

Valparai, Tamil Nadu

Our Approach & Solution / Project Scope

  • Drilling and establishing injection points at identified areas requiring internal treatment.
  • Pressure grouting to fill deep internal cavities and reduce porosity within the masonry.
  • Treatment of vulnerable joints and voids to restrict water movement through the structure.
  • Inspection and verification of treated areas to ensure effective consolidation and seepage control.

Project Results

  • Internal cavities and porous sections were treated through targeted injection grouting.
  • Reduced potential water pathways within the treated masonry.
  • Improved consolidation and water-tightness of the affected sections.
  • Enhanced the long-term protection and performance of the dam structure.

 

Have a problem to solve?

Cracks. Leaks. Corrosion. Deterioration. Structural distress. Tell us what you’re
seeing, and we’ll help determine what it needs and how to fix it.

Top A India Contractors

Reach Us

9750529111 / 666

info@topaindia.com

#1228 1st Floor, Asian Majestic Apartment, 15th Street West End colony, Anna Nagar West Extn, Chennai-600 101, Tamil Nadu

© 2008–2025 Top A India Contractors. All rights reserved.